Business Solar Systems in Geelong: Sizing, Costs and Payback for 30–100 kW

Most Geelong businesses that look at solar land somewhere between 30 and 100 kW. That’s a café or clinic at the small end, an office or retail strip in the middle, and a light-industrial unit, cold store or small warehouse at the top. It’s also the band where the numbers are easiest to check, because published prices exist and the incentives are well understood.

As a guide, Solar Choice’s September 2026 averages for Melbourne put a 30 kW commercial system at about $26,150 and a 100 kW system at about $77,310, after the federal certificate discount and including GST. Whether that pays off quickly depends on one thing more than any other: how much of the output your business uses while the sun is up. Bizsolar sizes commercial solar from your half-hourly interval data so you can see that figure before you commit.

What do business solar systems cost around Geelong?

Solar Choice publishes average commercial prices by capital city. These are Melbourne figures from September 2026, the closest published benchmark for Geelong.

System sizeAverage installed price (after STCs, incl. GST)Price per watt
30 kW$26,150$0.89
50 kW$47,090$0.95
70 kW$62,180$0.89
100 kW$77,310$0.84

These averages leave out several costs that often show up on commercial jobs: meter changes, ground mounting, grid protection equipment and network connection studies. Older roofs may also need a structural check, and switchboard upgrades are common. Ask for each item on a separate line.

Which incentives apply in this size range?

Two stack for most Geelong businesses in the 30 to 100 kW band.

The federal Small-scale Technology Certificates (STCs) are already built into the prices above. For systems up to 100 kW, the number of certificates depends on a deeming period that falls each January. A system installed in 2026 gets five years’ worth; one installed from 1 January 2027 gets four. On a 100 kW system that is a noticeable drop, so the install date matters more than the signing date.

The Victorian Energy Upgrades (VEU) program adds a separate discount for non-residential solar between 30 and 200 kW. The government’s indicative figures, based on a $70 certificate price, are $4,550 for 50 kW, $6,860 for 75 kW and $9,100 for 100 kW. The work has to go through a VEU accredited provider, the inverter must be at least 30 kVA, and panels and inverters need 10-year and 5-year warranties respectively.

If your site needs more than 100 kW, read our guide to commercial solar rebates in Geelong. Systems up to 1 MW installed from 1 October 2026 can now earn upfront STCs, with applications expected to open in mid to late November.

How do you size a business system?

Start with your interval data rather than your total bill. Your retailer or Powercor’s myEnergy portal can give you 12 months of half-hourly usage, which shows how much power the business draws between about 9am and 4pm on weekdays and weekends.

Size the system so most of its output is used on site. Exported solar earns very little in Victoria now. There has been no regulated minimum feed-in tariff since July 2025, so a kilowatt-hour sent to the grid is worth a fraction of one you’d otherwise buy.

The VEU program offers a rough guide to which businesses suit which sizes:

  • 30 to 50 kW: offices, retail sites, aged care and local government buildings
  • 50 to 100 kW: warehouses, schools, aquatic centres and larger commercial sites

Roof space is the other limit. A 100 kW system typically needs about 450 to 600 square metres of clear, unshaded roof.

How do you work out payback?

You need four numbers: system price, expected yearly output, the share you’ll use on site, and what you pay per kWh during the day.

Here is a worked example for a 30 kW system. It’s illustrative only; your inputs will differ.

  1. Price: $26,150 (Solar Choice Melbourne average, September 2026).
  2. Output: about 38,100 kWh a year, using an estimate of roughly 1,270 kWh per kW per year for Greater Geelong.
  3. Used on site: 80%, or about 30,480 kWh. This assumes steady weekday daytime load.
  4. Daytime rate: 25 cents per kWh. Replace this with the rate on your own bill.

At those inputs the system offsets about $7,620 of electricity a year, which puts simple payback at roughly three and a half years. That leaves out GST credits, finance, maintenance, demand charges and any VEU discount, all of which move the result.

For reference, the 2026–27 Victorian Default Offer for small businesses on the Powercor network is 27.36 cents per kWh on a flat tariff, or 36.29 cents in the 9am to 9pm weekday peak on time-of-use. It applies only to businesses using under 40 MWh a year. Larger sites are usually on negotiated contracts, often with lower energy rates but demand charges that solar alone may not reduce.

What about weekends, batteries and leased premises?

If the business closes on weekends, that output is mostly exported. Factor it in, or size the system slightly smaller. A battery can help if you run evening loads such as refrigeration or late trading. Our solar batteries page explains when storage pays off, and small businesses can use the federal battery discount too.

If you lease, you’ll need the building owner’s approval for roof works. Solar can still suit both parties. We can prepare the technical details a landlord usually asks for.

How Bizsolar handles business solar

We model your interval data and tariff, check roof structure and switchboard, and lodge the Powercor connection application. Installs are planned around your trading hours, with any short shutdowns scheduled in advance. You get a proposal with modelled self-consumption, an itemised price and payback calculated from your own numbers.

FAQs

How much does a 50 kW solar system cost for a business?

Solar Choice’s September 2026 Melbourne average was about $47,090 after STCs, including GST, before any VEU discount or site-specific extras. Bizsolar gives a fixed price after a site assessment.

Can a business get both STCs and the VEU discount?

The VEU program says businesses may also claim other incentives, and its guidance covers systems of 30 to 100 kW earning STCs. The VEU work must go through an accredited provider. We confirm how both apply in your proposal.

Should we install before January?

For systems up to 100 kW, the STC deeming period drops from five years to four on 1 January 2027, which reduces the discount. Network approval can take weeks, so contact Bizsolar early if you’re aiming for December.

Can solar run our equipment during a blackout?

Not on its own. Grid-connected solar shuts down in an outage. Backup needs a battery and inverter designed for it. We can model backup for critical loads.

Is solar tax-deductible for a business?

Solar is usually a depreciating business asset, and small businesses may be able to use simplified depreciation rules. Systems in this size range generally cost more than the $20,000 instant asset write-off limit, so check the treatment with your accountant.

See your own payback figure

The worked example above is a starting point. Your interval data gives the real answer. Send us 12 months of usage data or recent bills, and we’ll book a free site assessment for your Geelong business. Book a free commercial site assessment or call 1300 537 363.